Customer
Mosenergo JSC

Since the end of 2010, design and survey, construction and installation works have been carried out to implement the project for building new PGU-220T combined cycle power unit at CHPP-12 of Mosenergo JSC. 

Trest SZEM  CJSC, under a contract with TEK Mosenergo JSC dated July 25, 2012, carried out the installation of gas and steam turbines, as well as all auxiliary equipment and pipelines of the machine hall at the constructed PGU-220T power unit of CHPP-12 of Mosenergo JSC.

The main equipment of the constructed power unit produced by OJSC "Power machines": GTE-160 gas turbine with T3FG-160 turbo-generator, T-56/73 steam turbine with T3FP-80 turbo-generator.

CHPP-12 is located in the Dorogomilovo district of the Western Administrative District of Moscow. The main task of CHPP-12 is a reliable power supply to the central areas of the city. The use of modern combined cycle technologies within the construction made it possible to ensure high efficiency in the generation of electric and thermal energy and to minimize the negative impact on the environment.