Customer
LUKOIL-Energoengineering LLC

Trest SZEM  CJSC, under a contract with LUKOIL-Energoengineering LLC, completed the I stage of the Yarega Energy Park construction, including:

  • preparation of the construction site
  • construction of temporary roads
  • installation of modular headquarters
  • construction work on the 1st Main Building of the Gas Turbine Cogeneration Plant (GK 1.1.)
  • construction work on the 2nd Main Building of the Gas Turbine Cogeneration Plant (GK 1.2.)
  • construction work on chimneys (3 pieces of 45 m each)
  • construction of the operator's room 1.7
  • construction of a materials warehouse with an indoor oil warehouse
  • construction of an entrance checkpoint

The construction of the Yarega Energy Park, necessary to meet the own needs of LUKOIL-Komi LLC (Yarega oil and titanium field), implies the creation of a 75 MW Gas Turbine Cogeneration Plant with three standard GTES-25PA with a capacity of 25 MW each manufactured by Aviadvigatel OJSC (Perm). Natural gas from the Kuryino-Patrakovsky gas condensate field is used as a fuel for GTU.