CustomerObject locationStart/End of Work
LUKOIL-Energoengineering LLC Republic of Komi, Yareg oil field2015/2017

Trest SZEM  CJSC, under a contract with LUKOIL-Energoengineering LLC, completed the I stage of the Usa Energy Park construction, which included:

  • preparation of the construction site
  • construction of temporary roads
  • construction of an auxiliary portacabin boiler house 
  • construction of heat networks
  • construction work on the 1st Main Building of the Gas Turbine Cogeneration Plant (GK 1.1.)
  • construction work on the 2nd Main Building of the Gas Turbine Cogeneration Plant (GK 1.2.)
  • construction work on chimneys (4 pieces of 45 m each)
  • construction work on the outdoor installation of transformers
  • construction work on the boosting compressor station
  • construction of the operator's room
  • construction of a fire pump house (FPH)
  • construction of a rain pump station
  • construction of a domestic wastewater sewage pumping station
  • construction of domestic wastewater treatment facilities
  • construction of a drinking water treatment building
  • construction of a water metering unit
  • construction of a materials warehouse with an indoor oil warehouse
  • construction of modular headquarters
  • construction of an entrance checkpoint
  • installation of internal engineering networks

The construction of the Usa Energy Park, necessary to meet the own needs of LUKOIL-Komi LLC (Komi Republic, Usinskoye field, Severnaya site), implies the creation of a 100 MW Gas Turbine Cogeneration Plant with four standard GTES-25PA with a capacity of 25 MW each manufactured by Aviadvigatel OJSC (Perm). Natural gas will be used as fuel for GTU. The heat of the GTU exhaust gases is used in waste-heat boilers manufactured by Podolsk Machine-Building Plant OJSC.