Novo-Salavatskaya CHPP

Construction works, heat installation works, electrical installation work, installation of Automatic Process Control System and instrumentation, commissioning.

Detail

Pravoberezhnaya CHPP

Construction of a new power unit No. 2 of Pravoberezhnaya CHPP-5 (PGU-450)

Detail

Yugo-Zapadnaya CHPP

Construction of power units

Detail

110 MW Gas Reciprocating Cogeneration Plant in Tikhvin

Construction of Gas Reciprocating Power Plant

Detail

Adler TPP

Full set of works on installation of thermal and mechanical equipment and engineering systems of 2 combined cycle power units of Adler TPP

Detail

Novokuznetskaya GTPP

The entire set of general construction and heat installation work

Detail

Usa Energy Park

Usa Energy Park I stage construction works

Detail

CHPP-9 of Moscow

Works on technical re-equipment and reconstruction of CHPP-9

Detail

Yarega Energy Park

Detail

CHPP-12 of Moscow

Design and survey and construction and installation work for implementing the project of building a new combined cycle power unit

Detail

CHPP-16 of Moscow

Construction of PGU-420T power unit No. 8 with an electric capacity of 424.4 MW

Detail

CHPP-20 of Moscow

Construction of PGU-420T power unit at CHPP-20 of Mosenergo OJSC

Detail

Pervomayskaya CHPP

Installation of a steam turbine with a generator and two gas turbine units

Detail

Nazarovskaya State District Power Plant

Works on technical re-equipment of P-49 boiler plant

Detail

Novovoronezh NPP-2

Строительно-монтажные работы на энергоблоках №1 и №2

Detail